Elevators being fitted to the tailplane - 12/09 |

Check for travel and clearances - 12/09 |

Aileron attach brackets - 2/2010 |

Elevator
Bellcrank weldments and spacer - 2/2010 |

Elevator
Bellcrank Assembly pinned in place - 2/2010 |

Aileron fitted to wing - 2/2010 |

Inboard Aileron
Attach Bracket, in place - 2/2010 |

Aileron
Bellcrank Aligned with Aileron, ready for Attach
Bracket and Push-Pull rod placement - 2/2010 |

Outboard Aileron Attach Bracket, in place - 2/2010 |

First layer of plywood on right hand aileron. May 2010 |

First coats of brown camoflauge paint on the elevators. May 2010 |

First coats of brown camoflauge paint on the elevators. May 2010 |

Right hand aileron with first layer
of skin glued-on the bottom and spruce strips to
capture the balsa, which is next. May 2010 |

Right hand aileron with first layer
of skin glued-on the bottom and spruce strips to
capture the balsa, which is next. May 2010 |

Balsa glued on the bottom. May 2010 |

Ready for sanding and final ply. May 2010
|

Elevator, done except for the dope codes. July 2010
|

Elevator, done except for the dope codes. July 2010
|

Bottom of the elevators, dope codes and part numbers applied -
ready to be installed on the airplane. July 2010
|

Bottom of the elevators, dope codes and part numbers applied -
ready to be installed on the airplane. July 2010
|
|
|
Updates will be more forthcoming in the
future to show steady progress on the
prototype.
For details on any part of the
assembly, please
email with request. |